Happy Birthday Ashton! Last night Max and Alek worked all night on the bus. They measured, they planned, and they got all of the supplies at Home Depot. They are installing in a subfloor that is constructed out of wood and tile. We are doing this in order to nail the couch and shelving to the ground, in the hopes of prevent sliding. They installed floor illumination made from x-mas lights--so awesome! They also bought our 700Hz gas generator. We are going to divide the bus into 3 main sections. The front section will be the driving area and will be curtained off from the middle section. The middle section will have the couch, and kitchen space. The back will be section off using drywall with a round door which resembles a submarine. This will be our carpeted bedroom. Our porch (or handicap lift) is attached to the bedroom. Most of the wiring is completed, the floor is down. LETS GO NETHERLANDS!